Derogation Decision details


General information

Decision on the request by the TSO to derogate of certain requirements of the RfG network code for electricity generation units with a maximum installed capacity < 25 MW and a voltage at the connection point >= 110 kV
Elia System Operator NV (TSO)
2019-07-09
For new units of type D that are connected to the grid at a voltage level of 110 kV or higher and with a capacity of less than 1 MW, a general deviation is r... see more
Yes
Network code specific

RfG
D
7
56.000
Decision related

2019-12-06
Yes
For the new electricity generation units with a maximum installed capacity of up to 1 MW (not including 1 MW) and with a voltage at the connection point of 1... see more
The responses received during the public consultation organized by Elia regarding the request for derogation, were all positive. No significant risk and neg... see more
The new electricity generating units connected to the transmission network at a voltage level of 110 kV or higher of the power categories corresponding with ... see more
No significant risk and negative impact has been identified for the derogation requested, including adverse effects on cross-border trade.