CHEST APPLICATION
Login
Back
Data item details
Name
Electrolyser projects by project status and estimated commissioning year – 2023-2030 (GW)
Source
ACER based on data from the European Hydrogen Observatory and S&P Global Commodity Insights and own calculations.
Identifier
Reference
Figure 17
Comment
Definitions of the maturity of projects as per S&P Global Commodity Insights are as follows: advanced planning, projects that have completed the feasibility study and are moving forward with front end engineering and design, applying for permits, issuing purchase orders for equipment, or taking an FID; early planning, projects with a feasibility study in progress or applied for funding; announced, earliest-stage projects — projects announced with very limited information on the partners and stakeholders, the capacity of H2 production, the online date, etc.
Data item data can be filtered and exported as an Excel file.
The reason for exporting is asked during export once per session.
Electrolyser projects
Cumulative capacity
Download as CSV
Download as Excel
Download filtered data
Download whole data
Clear filters
Year
2023
2024
2025
2026
2027
2028
2029
2030
Project status
Advanced planning
Announced
Early planning
Operational
Under construction
Fields to export
Capacity (GW)
Year
Project status
Capacity (GW)
2023
Operational
0.20
2025
Operational
0.00
2025
Under construction
0.90
2025
Advanced planning
1.50
2025
Early planning
1.40
2025
Announced
5.20
2023
Under construction
0.00
2023
Advanced planning
0.00
2023
Early planning
0.00
2023
Announced
0.00
2024
Operational
0.20
2024
Under construction
0.30
2024
Advanced planning
0.00
2024
Early planning
0.00
2024
Announced
0.00
2026
Operational
0.00
2026
Under construction
0.50
2026
Advanced planning
0.50
2026
Early planning
2.40
2026
Announced
1.80
2027
Operational
0.00
2027
Under construction
0.00
2027
Advanced planning
1.40
2027
Early planning
5.50
2027
Announced
5.60
2028
Operational
0.00
2028
Under construction
0.00
2028
Advanced planning
0.80
2028
Early planning
4.70
2028
Announced
2.60
2029
Operational
0.00
2029
Under construction
0.00
2029
Advanced planning
1.00
2029
Early planning
3.00
2029
Announced
0.10
2030
Operational
0.00
2030
Under construction
0.00
2030
Advanced planning
0.00
2030
Early planning
4.20
2030
Announced
28.00
Download as CSV
Download as Excel
Download filtered data
Download whole data
Clear filters
Year
2023
2024
2025
2026
2027
2028
2029
2030
Fields to export
Cumulative capacity (GW)
Year
Cumulative capacity (GW)
2023
0.20
2024
0.70
2025
9.80
2026
15.10
2027
27.60
2028
35.70
2029
39.80
2030
72.00
What is the purpose of your download?
×
Please specify your reason for exporting data.
Download reason
Research
Commercial
Curiosity
Data analysis
Study
Other
Please specify
OK
Cancel