Data Item Details


Name
Overview of EU LNG terminals tariffs per service
Source
ACER based on LNG System Operators and NRAs
Business Symbol
Reference
Figure 33
Comment
The assessment specifically examines those costs using the tariffs for a bundled service, encompassing unloading, storage, and regasification services. The assessment is done for the second half of the year 2023 and considers LNG with an energy content of 1000 GWh to be offloaded, stored, regasified and injected into the system over a period of 15 days. The comparison considers for both LNG and system access tariffs annual ontracts,
normalized with a 100% load factor. When relevant, the size of the cargoes considered is 140.000 m3. The primary data source utilized is the information published by LSOs in the GLE Transparency template. Particularly, for various negotiated terminals, the results are based on partial information published
about concluded allocation processes, but not on firm published tariffs as they are not available.

Data item data can be filtered and exported as an Excel file.
The reason for exporting is asked during export once per session.




Fields to export

Member state Terminal Unlodad, store and regas (euros/MWh) Network access (euros/MWh) All terminal services and access into network (euros/MWh)
BelgiumZeebruge0.650.090.74
CroatiaKrk1.050.271.32
Finland Inkoo2.460.392.85
FranceFos Cavaou1.410.261.67
FranceFos Tonkin0.970.261.23
FranceMontoir0.640.260.90
FranceDunkerque0.000.000.00
GermanyBrunsbüttel1.880.582.46
GermanyWilhelmshaven1.980.582.56
GreeceRevithoussa0.340.350.69
ItalyToscanaLivorno1.750.312.06
ItalyAdriatic1.280.231.51
ItalyPanigaglia0.860.261.12
ItalyPiombino0.890.311.20
LithuaniaSC Klaipedos Nafta1.410.391.80
NetherlandGATE1.140.311.44
NetherlandsEems Energy1.640.311.94
PolandSwinoujscie1.620.001.62
PortugalSines0.370.230.60
SpainHuelva, Cartagena, Sagunto, Musel, Barcelona, Bilbao and Mugardos0.280.430.71