Data item details


Name
Largest changes in utilisation of gas transmission network cross-border interconnection points, Q3 2025 and Q3 2024
Source
ACER based on ENTSOG and JRC data.
Identifier
Reference
Page 16 (left)
Comment
Only Interconnection points where utilisation changed by 10% or more are shown. The methodology for aggregating both cross-border gas flows and firm technical capacity relies on specific strategies to form the timeseries for each edge of the target topology using JRC’s eurogastp Python package. Low-calorific gas flows and corresponding capacities are excluded. To align with ENTSOG’s capacity map and observed gas flows, firm technical capacity has been further refined on a case-by-case basis using various approaches.

Data item data can be filtered and exported as an Excel file.
The reason for exporting is asked during export once per session.


2025-10-24 15:21


Fields to export

pipeline From To Utilisation (%, 2024) Utilisation (%, 2025)
UA SKUASK21%0%
SK CZSKCZ22%0%
UA PLUAPL39%0%
SK ATSKAT20%0%
UA MDUAMD13%0%
AT ITATIT18%1%
BE FRBEFR23%6%
HR HUHRHU38%8%
IT ATITAT0%11%
PT ESPTES52%11%
DK DEDKDE2%16%
LT PLLTPL0%18%
SK UASKUA0%21%
IGB BGIGBBG16%26%
EE FIEEFI4%29%
FI EEFIEE46%32%
HR SIHRSI82%35%
CH ITCHIT27%40%
RO MDROMD20%44%
AT HUATHU0%53%
DE NLDENL40%56%
NL DENLDE40%58%
DE ATDEAT6%59%
FR BEFRBE25%61%
BE NLBENL43%62%
BG GRBGGR95%62%
PL UAPLUA0%73%
BG ROBGRO42%75%
HU SKHUSK97%76%
DE PLDEPL31%83%
DK PLDKPL54%84%
DE CZDECZ83%95%
HU UAHUUA65%99%